Tuesday, 14 March 2017

Unit 4 creative Media PMP Task 1 I & J

Potential Production constraints and how to counter them
The Potential Constraints of the production are:
  • Scheduling - The Cast and Crew and the equipment would be required for the other PMP's
  • Location - I may not be able to get access to my intended filming locations on the filming days
  • Weather - The weather forecast of the filming days could be inaccurate and instead of it being sunny or slightly clouded, it could be torrentially raining.
how to counter the constraints:
  • Make sure you schedule the equipment, cast and crew as soon as you are available to.
  • the same as scheduling if you do not make sure you have a back-up location prepared.
  • always double check the weather forecast and bring water proof clothing to the location and water protectors for the equipment  

No comments:

Post a Comment